Project Description
Midwest Construction removed the existing deck and hauled it all away. Helical Piers/Frost Footings were set and then the Therma-Deck Floor System was installed. Back wall and roof line were prepared. Walls set and then roof set and tied into to the existing roof line. The deck was built for extra space using Azek composite deck with Westbury Aluminum Railings. The job site was cleaned up daily, all tools secured and all of the construction debris was hauled away.